Fort McCoy home generators
For wooded Fort McCoy lots off CR 316, a standby generator that starts on its own, runs on the propane you can store, and keeps the well, the air and the router going.
Hurricane Milton, Oct 10, 2024
70,394Marion County electric customers out, 31.3% at the Florida PSC 9 AM report
Or call (352) 780-1430. A licensed installer who serves your area calls back, usually within one business day.
Nearby on the map
In Hurricane Helene in 2024, about 9,096 Clay Electric customers in Marion County lost power, part of roughly 41,778 out countywide.
Between Sparr, Eureka and the national forest
- 32134
- Fort McCoy ZIP code
- CR 316
- main road through town, between Sparr and Eureka
- 1996
- year the 1936 brick schoolhouse became the public library
- 9,096
- Clay Electric customers in Marion out during Hurricane Helene
Fort McCoy sits on County Road 316 between Sparr and Eureka, directly north of Silver Springs by way of County Road 315, with the Ocala National Forest starting to the east. The name reaches back to the Second Seminole War: the post was first called Fort Mackay, after a militia captain killed while surveying the Itonia Scrub on March 20, 1839.
The community's landmarks are its schools. A brick schoolhouse opened in 1936 on donated land and became the Fort McCoy Public Library in 1996. Fort McCoy School opened its current campus in 1988 for pre-K through eighth grade, and most high schoolers ride to North Marion High School in Citra. Homes here sit on wooded lots and acreage, many well back from the road.
The co-op office down CR 316
Clay Electric Cooperative runs one of its six district offices at 25180 E. County Road 316 in Salt Springs, a short drive east, and serves part of northeast Marion. Some Fort McCoy addresses may be on another utility, so check the name on your bill.
Clay's Marion members have taken some of the county's hardest hits. During Irma in 2017, the county's update had 92% of Clay customers in Marion without power. In Helene in 2024, Clay had 9,096 Marion customers out. On forest-edge roads, fallen trees often have to be cleared before lines can be restored. A standby generator removes the wait from your side of the meter: it starts on its own, and the transfer switch moves the house over within seconds.
Three steps to power
Out on a wooded Fort McCoy road, a long outage means a dead well pump, a hot house and a wait that depends on downed trees being cleared first.
Free estimate
The installer walks the lot for a clear pad spot away from limbs, checks the panel, the well and the propane tank, and writes up the price.
Install day
One to two days at the house: pad, generator, transfer switch and propane line, followed by Marion County inspections.
Power on
Startup and a test with the well pump on, then a look at keeping needles and leaves clear of the unit.
Wooded lots and where the unit can sit
Free in-home estimate, written price, no obligation.
Get my estimateTrees are the reason many people live in Fort McCoy, and they are also the main planning issue for a generator. The unit needs open space: Generac, citing NFPA 37, calls for 5 feet from windows, doors and vents, 5 feet clear above, and 3 feet at the front and ends. Local code takes precedence where it is stricter.
The installer walks the lot looking for overhanging limbs, roots under the pad area and a spot on firm, well-drained ground with short runs to the electrical service and the propane tank. Once it is in, keeping pine needles and leaves cleared from around the enclosure makes the yearly service visit quick.
Who is home when the lights go out
Fort McCoy households want power back for different reasons. Retirees worry about heat and medicine that has to stay cold. Families on a private well worry about water for cooking, bathing and flushing. People who work from home lose income every hour the router is dark.
The installer starts with your list, not a stock package. The sizing tool lets you check off the well, the air conditioning and the office before the visit. If someone relies on oxygen or another powered device, read medical equipment backup power. Remote workers can see generators for home offices, and well owners the well water guide. Most homes here run on propane; the fuel guide covers tank size and run time.
From request to running in Fort McCoy
Fort McCoy is unincorporated, so your installer pulls the electrical and gas permits through Marion County Building Safety and books the inspections. Typical Florida installs run about $7,000 to $15,000 complete, including pad, fuel line, transfer switch, permits and startup; a new propane tank or a long run from the house to the tank adds to it. The cost guide shows the parts.
Most projects take four to eight weeks from signed estimate to power on, with one to two days of work at the house. One request reaches the licensed installer who serves northeast Marion, usually with a call back within one business day. When the next storm drops a pine across the line, the house keeps running while the road gets cleared.

Straight answers
Free in-home estimate, written price, no obligation.
Get my estimateIs my Fort McCoy home on Clay Electric?
Possibly. Clay Electric Cooperative serves part of northeast Marion and has a district office on County Road 316 in Salt Springs, but some Fort McCoy addresses may be on a different utility. The name on your bill settles it. The installer confirms it at the estimate because the utility affects meter and service work.
Can a generator go on a heavily wooded lot?
Yes, with the right spot. The installer looks for a place that meets the manufacturer's clearances from windows, doors and the house, with open space above the unit and no low limbs over it. Roots and drainage are part of that walk-around. The chosen spot and any clearing needed are written into the estimate.
How long does a propane tank last during a Fort McCoy outage?
It depends on the tank and the load. A 22 kW unit uses about 2.2 gallons an hour at half load and about 3.7 at full load. Your installer checks your tank and gives you a realistic number of days, and suggests a larger tank if you want more time between refills.
Do I file anything with the county myself?
No. Fort McCoy is unincorporated, so permits go through Marion County Building Safety, and your installer pulls the electrical and gas permits and schedules the inspections. You only need to be available for the estimate and, ideally, for the startup walk-through at the end.