Reddick home generators
Keep the well pump, the barn fans and the air conditioning running when north Marion goes dark, with one request to a licensed installer who already works Reddick's roads.
Hurricane Milton, Oct 10, 2024
70,394Marion County electric customers out, 31.3% at the Florida PSC 9 AM report
Or call (352) 780-1430. A licensed installer who serves your area calls back, usually within one business day.
Nearby on the map
During Hurricane Irma in 2017, Marion County reported 92% of Clay Electric customers and 90% of Duke Energy customers in the county without power.
A 449-person town ringed by pasture
- 449
- people in the Town of Reddick at the 2020 Census
- 1925
- year Reddick incorporated, 43 years after it was platted
- 15 miles
- north of Ocala, in the county's pasture country
- 92%
- of Clay Electric's Marion customers out during Hurricane Irma
Reddick was platted on June 8, 1882, named for John Reddick, its first postmaster, and incorporated as a town in 1925. The town itself covers about 1.26 square miles. The old Reddick High School auditorium still stands, and Reddick-Collier Elementary sits in town. Step past the town line and you are in pasture: barns, paddocks and long private drives.
That is why an outage here hits differently than it does in a subdivision. When the line goes down on a Reddick road, the lights are the least of it. The well pump stops, so the house has no water and the troughs stop filling. Barn fans quit in the worst of the heat. The freezer with feed supplements and medicine starts its slow count.
A whole-home standby generator sits on a pad outside, watches the utility line, and starts on its own when power drops. The automatic transfer switch moves the house over within seconds, whether you are in the barn, at the feed store or out of town.
Clay, SECO or Duke: who is on your pole
North Marion is split among more than one electric utility, so two Reddick neighbors can have different bills. Clay Electric Cooperative serves part of north and northeast Marion under a territorial agreement with the City of Ocala, amended in 2019. SECO Energy and Duke Energy Florida serve other roads nearby.
It matters because recovery can look very different by utility. In Irma, the county's update had Clay at 92% of its Marion customers out, Duke at 90% and SECO at 52%. In Hurricane Helene in 2024, Clay alone had 9,096 Marion customers without power.
Your installer reads your meter and service at the estimate, because the utility shapes meter work and the transfer switch setup. You do not need to figure it out ahead of time, but your latest bill helps.
Three steps to power
Without backup, a long outage in Reddick means no well water for the house or the troughs, no barn fans in August, and a freezer counting down.
Free estimate
A licensed installer who serves Reddick walks the house and barn, reads your meter and panel, checks your propane tank, and puts the price in writing.
Install day
Pad, generator and transfer switch go in over one to two days, the fuel line runs to your tank, and inspections are booked with the right office.
Power on
Startup, a test with the well pump and barn loads running, and a walk-through so everyone at home knows what the generator does on its own.
Town permit or county permit
Free in-home estimate, written price, no obligation.
Get my estimateReddick is an incorporated town with its own mayor and council, which raises a fair question: who signs off on a generator? The answer depends on how the town handles building permits for your address, so your installer confirms whether the paperwork runs through the Town of Reddick or through Marion County Building Safety.
The work itself follows a common Florida pattern. An electrical permit covers the transfer switch and panel work. A gas permit covers the fuel piping to your propane tank or gas meter. Some jobs also need a building permit for the pad. Inspections usually come in rounds: rough electrical, rough gas, then a final before startup. Your installer pulls the permits and books the inspections; you do not stand in line anywhere.
Sizing for a well, waterers and barn fans
The size of a Reddick generator is usually set by what starts, not what runs. A well pump and a row of barn fans each pull a surge when they kick on, and the generator has to absorb those surges while the air conditioning is running. That is why the list comes first and the kilowatts come second.
Start with the honest homework. Run the generator sizing tool with the well pump checked, then read the horse farm guide for barns on separate panels and the well water guide for pump math. Load management can let a mid-size unit carry a bigger property by pausing a large load while the pump starts. Your estimate shows both options with prices, so you choose.
What a Reddick install costs and how long it takes
Typical Florida installs run about $7,000 to $15,000 complete: generator, pad, fuel connection, transfer switch, permits and startup. A long trench out to a barn or a new propane tank pushes a farm toward the upper end, and the written estimate lists each piece. The cost guide shows where the money goes.
Most projects take four to eight weeks from signed estimate to power on, with one to two days of work at the property. One request reaches the licensed installer who serves Reddick, so you are not calling around, and you usually hear back within one business day.
Picture the next big storm with it in place. The line drops, the generator starts within seconds, the pump keeps filling the troughs, and the barn fans never stop turning.

Straight answers
Free in-home estimate, written price, no obligation.
Get my estimateDoes the Town of Reddick issue generator permits itself?
That depends on how permitting is handled for your address, so your installer checks before filing. Either way the installer pulls the electrical and gas permits, and a pad permit if one is needed, then schedules the inspections. You do not have to visit a permit counter. The answer goes in your written estimate so the timeline is clear from the start.
My barn is on its own panel. Can one generator cover the house and the barn?
Often, yes. The installer looks at the distance between the buildings, the barn loads and how the barn is fed, then recommends either one larger unit with the right transfer equipment or a separate setup for the barn. Both choices are priced in the written estimate so you can compare them side by side before you commit.
How can I tell whether my Reddick home is on Clay, SECO or Duke?
Your electric bill names the utility. North Marion is split among Clay Electric Cooperative, SECO Energy and Duke Energy Florida, so neighbors can differ. If you are not sure, the installer confirms it at the estimate by looking at the meter and service, since the utility affects meter work and how the transfer switch is set up.
How much propane does a standby generator burn on a farm?
It depends on size and load. As one example, a 22 kW Generac air-cooled unit uses about 2.2 gallons an hour at half load and about 3.7 at full load. Your installer checks your tank against the loads you want covered and tells you roughly how many days you can run, and whether a larger tank is worth adding.
How soon will someone call me back?
Usually within one business day. Your request goes to the licensed installer who serves Reddick and the surrounding north Marion roads. They call to set a time for the free in-home estimate, walk the house and barn, and leave you a written estimate. There is no obligation and no pressure to sign that day.